8th and Main (Zion’s Bank), Boise, ID
2012-2013
Project Manager – Jeremy Presley
MTI provided the original geotechnical investigation some twelve years prior to actual construction. The foundation design involved a combination of deep concrete caissons and raft/matt foundation system, and was subject to a number of alterations as a result of project changes from the original design. Further foundation evaluation and forensic testing was performed on the existing structural elements, as part of the design of the final structure.